Based on : Aviation24.be · Aviation24.be · Aviation24.be · Aviation24.be · Aviation24.be
The announcement and timetable
According to Aviation24.be, Amsterdam Schiphol schedules work on runway 04/22 · Oostbaan.
Published details
The announced operating period ends on April 27, 2020. The announced date is March 16, 2020. Runway length (metres) : 2,000. Planned asphalt (tonnes) : 11,000. LED lights : 300.
Later retrospective context · March 29, 2020
Later in this chronology, on March 29, 2020, According to Aviation24.be, Amsterdam Schiphol removes smoking areas from its terminal. The start is planned for April 2020.
Later retrospective context · August 19, 2020
Later in this chronology, on August 19, 2020, According to Aviation24.be, Amsterdam Schiphol speeds up processing for short-connection passengers. Self-service kiosks allow passengers to print a connection pass. The scheme speeds up security and passport checks for short connections.
Later retrospective context · September 23, 2020
Later in this chronology, on September 23, 2020, According to Aviation24.be, Amsterdam Schiphol prepares its logistics chain for vaccines. Partners cited : Air Cargo Netherlands, Air France KLM Martinair Cargo. Temperature scenarios considered : 4. Round table planned for : September 29, 2020.
Later retrospective context · January 4, 2021
Later in this chronology, on January 4, 2021, According to Aviation24.be, Amsterdam-Schiphol reports 20,900,000 passengers for 2020. Reported volume falls 71% against the same period a year earlier. Activity also comprises 227,304 take-offs and landings. Reported cargo volume reaches 1,400,000 tonnes. Cargo-only flights : 23,782. The published network covers 316 destinations.
Summary written with AI assistance using the sources listed. Announcements and forecasts are attributed to their authors; publication does not confirm that plans have been carried out.



