Based on : Aviation24.be · Aviation24.be · Aviation24.be · Aviation24.be · Aviation24.be
The announcement and timetable
According to Aviation24.be, Amsterdam Schiphol removes smoking areas from its terminal.
Published details
The start is planned for April 2020.
Earlier archive context · March 9, 2020
On March 9, 2020, According to Aviation24.be, Amsterdam Schiphol schedules work on runway 04/22 · Oostbaan. The announced operating period ends on April 27, 2020. The announced date is March 16, 2020. Runway length (metres) : 2,000. Planned asphalt (tonnes) : 11,000. LED lights : 300.
Later retrospective context · August 19, 2020
Later in this chronology, on August 19, 2020, According to Aviation24.be, Amsterdam Schiphol speeds up processing for short-connection passengers. Self-service kiosks allow passengers to print a connection pass. The scheme speeds up security and passport checks for short connections.
Later retrospective context · September 23, 2020
Later in this chronology, on September 23, 2020, According to Aviation24.be, Amsterdam Schiphol prepares its logistics chain for vaccines. Partners cited : Air Cargo Netherlands, Air France KLM Martinair Cargo. Temperature scenarios considered : 4. Round table planned for : September 29, 2020.
Later retrospective context · January 4, 2021
Later in this chronology, on January 4, 2021, According to Aviation24.be, Amsterdam-Schiphol reports 20,900,000 passengers for 2020. Reported volume falls 71% against the same period a year earlier. Activity also comprises 227,304 take-offs and landings. Reported cargo volume reaches 1,400,000 tonnes. Cargo-only flights : 23,782. The published network covers 316 destinations.
Summary written with AI assistance using the sources listed. Announcements and forecasts are attributed to their authors; publication does not confirm that plans have been carried out.



