Based on : Aviation24.be · Federal Aviation Administration · Aviation24.be
The announcement and timetable
According to Aviation24.be, FAA lifts the US 737 MAX grounding, subject to conditions.
Published details
The decision mandates software and wiring changes. Pilot training includes mandatory simulator sessions. Each aircraft must complete the required checks and readiness flight before returning. This is a US regulatory decision; other authorities follow their own procedures. The reported events are dated November 18, 2020.
Earlier archive context · July 26, 2020
On July 26, 2020, According to Aviation24.be, FAA mandates inspections of around 2,000 grounded Boeing 737 Classic / NG aircraft. Grounding threshold triggering inspection (days) : 7. The directive addresses corrosion and sticking risks in engine air-system valves. These measures are those described in 2020 and should be read in that historical context.
Summary written with AI assistance using the sources listed. Announcements and forecasts are attributed to their authors; publication does not confirm that plans have been carried out.

