Based on : Aviation24.be
The announcement and timetable
According to Aviation24.be, Embraer completes the maiden flight of the E175-E2.
Further announcement details
The flight took place on 12 December at São José dos Campos, rather than on this report’s publication date. The E175-E2 flew for two hours and eighteen minutes. Embraer then plans a twenty-four-month certification campaign using three prototypes, with 80 seats in two classes or up to 90 in a single class.
Understanding the announcement
A first flight is a testing milestone. It checks the aircraft and systems in the configuration flown. It does not replace certification testing or the approvals required for commercial passenger transport. This milestone should therefore be understood as progress in a development programme.
Summary written with AI assistance using the sources listed. Announcements and forecasts are attributed to their authors; publication does not confirm that plans have been carried out.



