Based on : ATR — CVsky inter-island fleet expansion · CVsky — fleet expansion and expected arrival

The first aircraft in a two-plane expansion

ATR outlined on 14 October 2026 the delivery of a new ATR 72-600 to Singapore-based lessor Avation for CVsky (Linhas Aéreas de Cabo Verde), which operates domestic services across the archipelago. It is the first of two aircraft planned for the expansion and is intended to work alongside the two ATRs already in service. Additional capacity would support both residents travelling between islands and visitors looking to reach destinations beyond their initial arrival point.

ATR — CVsky inter-island fleet expansion ·

Handover and local arrival are separate steps

In early October, the airline announced the formal handover and a planned ten-working-day period for painting and customisation in France. It expected the aircraft to reach Cabo Verde by the end of the month. Contractual delivery must therefore be distinguished from deployment in the islands: ATR’s announcement does not establish that the first commercial rotation has already taken place. CVsky says integration will follow applicable maintenance, training and regulatory supervision requirements, with the civil aviation authority involved.

CVsky — fleet expansion and expected arrival ·

A young airline based in Praia

Founded in 2024 and based in Praia on Santiago island, CVsky began operating in 2025 under an ACMI arrangement, covering aircraft, crew, maintenance and insurance. ATR says it subsequently started its own operations in the IATA summer 2026 season. Better links to Praia from São Vicente and São Nicolau are among the network objectives described by the manufacturer. A Sal–Fogo route remains a planned service, with no confirmed launch date supplied in this announcement.

ATR — CVsky inter-island fleet expansion ·

Short flights with a wider social role

ATR puts the domestic network’s average flight time at 36 minutes and compares roughly 40 minutes by air between Praia and Sal with a sea crossing that can take around seven hours. Those are the manufacturer’s indicative comparisons. Ferries and flights serve complementary needs, with air links supporting work journeys, education, specialist healthcare and access to public services. The capacity increase consequently concerns the continuity of everyday connections between island communities as well as the development of tourism.

ATR — CVsky inter-island fleet expansion ·

Summary written with AI assistance using the sources listed. Announcements and forecasts are attributed to their authors; publication does not confirm that plans have been carried out.